Eclipse

Marine Dynamics first major refit was on a 110ft Dubois, the sailing yacht “Eclipse”. The time frame of this project was six months, which was met.
This job included some interior alterations,

  • Galley and Accommodation modifications
  • Fitting air conditioning units throughout the boat
  • Removal of pilot house windows/doors for corrosion treatment

Marine Dynamics major task was in the design and laying of a new teak deck.

  • 89 square metres of teak using SIKA [NZ] systems
  • Laying teak on 298 SIKA using 290 DC to pay the seams

This refit was carried out on a very tight time frame, working in with a number of other trades.