Marine Dynamics first major refit was on a 110ft Dubois, the sailing yacht “Eclipse”. The time frame of this project was six months, which was met.
This job included some interior alterations,
Marine Dynamics major task was in the design and laying of a new teak deck.
This refit was carried out on a very tight time frame, working in with a number of other trades.